Railway Exchange case drags on as lender loses a ruling
The lender for a former attempt to redevelop the Railway Exchange Building in downtown St. Louis has lost a court ruling in a case against the vacant structure's owner. The ruling, which came Monday, means the case will continue, possibly to a trial. …